Floors and tiling done. We took up some plumbing fixtures we expect will be installed directly. The oak floors are lovely. They´ve had some swelling issues in the humidity, but we hope that will go away with better weather.
The lack of a wall between the shower and tub was a disappointment, but we´re hoping the glass shower enclosure will improve it.
Met with the plumber to discuss a thermal store and water heater for hot water and radiators. We´re waiting for his proposal.
Went to the builder´s warehouse and saw our wood cooker with a back boiler- and I´m glad to report that it is stunning. But we forgot to take pictures.
Also met with the electrician and will presently be applying for the electrical service from Fenosa - fingers crossed!!
Onward and upward.